«back

  Main Works in Progress

Works in Progress EPC Projects Undertakings: Construction Undertakings: Manufacturing

YEAR
CUSTOMER
PROJECTS
SCOPE
04-04 ALUMAR ALUMAR ALUMINA REFINERY EXPANSION- UNIT 2 BE,E
04-04 ALUMAR EXPANSION 1.5 MTPY OS ALUMAR REFINERY BE,E
03-05 ALUNORTE DETAIL DESIGN, FIELD ENGINEERING, AS BUILT, FIELD ASSISTANCE - WHITE AREA E,CA
04-05 ALUNORTE NEW HYDRATE STORAGE BUILDING E
04-06 CST SLAB CONTINUOUS MACHINE # 3 E,P,C,M
04-04 INNOVA REVAMP AND NEW UNIT BENTOL BE,E,CA
04-05 NUCLEP/PETROBRAS SPECIALIZED TECHNICAL SUPPORT FOR PART OS P-51 SEMISUBMERSIBLE OF HULL CONSTRUCTION E,CM,C
00-04 PETROBRAS/CABIÚNAS CABIÚNAS GAS PROJECT AND PIPELINE - PHASE III E,P,M,C
03-04 PETROBRAS/CABIÚNAS AUTOMATION SYSTEM FOR GAS TREATMENT STATION P,C
03-04 PETROBRAS - GUAMARÉ QUEROZENE UNIT E,P,M,C
02-04 PETROBRAS -PEROÁ PLATFORM, JACKET, HELYPORT, ACOMODATION MODULE AND GAS TREATMENT PLANT (PEROÁ/CACIMBA GAS FIELD) E,P,M,C
04-05 PETROBRAS - REDUC FEED GAS COMPOSITION MODIFICATION BE
01-04 PETROBRAS - REDUC DEA, URE, AA UNITS AND HDT/HG INTERCONNECTIONS E,P,M,C
02-05 PETROBRAS - REDUC DELAYED COKE UNIT E,P,CA
02-05 PETROBRAS - REDUC DELAYED COKE UNIT E,P,CA
03-05 PETROBRAS - REDUC UFCC - REVAMP INCLUDING THE CLOSING OF COOLING SYSTEM E,P,M,C
04-04 PETROBRAS - REDUC NAPHTA HDT NEW UNIT E
01-04 PETROBRAS -REPLAN HEATER REFORMER E,P,M,C
03-06 PETROBRAS/ SERMAT INSPECTION AND EXPEDITION ACTIVITIES FOR MATERIALS AND EQUIPMENT P
03-04 PETROQUÍMICA UNIÃO S.A - PQU BASIC AND DETAIL DESIGN FOR THE REVAMP OF "PASTILHADORA" BE,E
03-04 VERACEL BASIC AND DETAIL WATER INTAKE, WATER TREATMENT, EFFLUENT TREATMENT AND EFFLUENT DISCHARGE E,P,M,C
03-05 VOITH-SIEMENS/CEMIG ELETRO-MECHANICAL ERECTION FOR IRAPÉ HYDRO POWER PLANT - 3 X 125MW C
.::: L E G E N D :::.
 E = ENGINEERING
 P = SUPPLIES
 S = STUDY
C = CONSTRUCTION
F = MANUFACTURING
M = SUPPLIER MATERIALS
BE = BASIC ENGINEERING
CA = ASSIST. CONSTRUCTION
CM = CONSTRUCTION MANAGEMENT
 LAST MODIFIED:14 OCTOBER 2004